| Simon's nursery, tastefully decorated with playful colors and designs |
| By June 20 the framing in the basement was well underway |
| Standing in the future master bedroom looking at the little pod of Old House that contains the upstairs bathroom. You can see the new wall and roof on the left side of the picture |
| June 27, the cabinets in the upstairs landing were removed and replaced with the remains of the bathroom sink |
| Our temporary master bedroom in the front of the house was converted to storage now that we weren't staying there anymore |
| Looking west out the back of the master bedroom. |
| We really like the way the top corner of the walls are angled with the roof... it adds a nice detail to the room without being restricting |
| The last picture of the old upstairs bathroom |
| Temp kitchen was dismantled. We had it for about 5 months and it was completely worth it |
| June 29, the last major demo work of the project is complete with the removal of the old upstairs bathroom and two of the walls of Simon's future room |
| Standing near the top of the stairs looking back through the second floor. That high wide window on the left will eventually be in the master bathroom |