| Standing by the front door looking all the way back to the kitchen window |
| Contractor Larry's right hand man Dave puts in new subflooring and reinforces the old |
| The old landing/bathroom, which will become the upstairs guest bath and (to the left of that new support wall) the master closet |
| Master closet will be in part of this area |
| Down in the basement, the beginnings of the sump pump are in place in the new mechanical room which also features the first new permanent drywall we've seen during construction so far |
| The old breaker box is hanging in the middle of what will eventually become the laundry room in the basement |
| Someday this will be a basement bathroom, but not as part of this construction project |
| Standing between the living room in the front of the house and the new dining room looking back towards the kitchen and new family room |
| The new wall and doorway between the family room and the dining room. The doorway is much wider than before which will help the dining room feel larger than it is |
| Future new family room off of the kitchen. This is where our temp kitchen was located for the first half of the year |
| The steel beams and solid construction make the house feel so much more secure than it used to. We're not worried anymore about Simon knocking the house down by accident someday |
| Standing by the kitchen window looking at the breakfast area. The new windows have all been put in (including that one you can see above the breakfast table) and we get so much light in the house now |
| At the kitchen sink looking at the rest of the kitchen. The fridge will be located on that half wall, with a short counter/cabinet peninsula extending to the right |
| Leaning out the kitchen window and looking south at the work being done on the new back steps |
| July 28 suddenly most of the framing was done on the second floor. This is looking from the master bedroom towards the wall of the master closet, and beyond that to the guest bath |
| Looking from the master bedroom at the master suite hallway and the master bath |
| Standing in the master closet looking through the wall and out the back of the house |
| Standing in the master bath looking through the wall at Grandpa Ken taking a picture of the view from the big master bedroom window |
| Grandma Cindy makes a few helpful notes on Contractor Larry's house plans, still located in Simon's room |
| Tough to distinguish with all of the framing but this is an angled view of the doorway to the guest bath on the right |
| Looking into the guest bath from the doorway on July 31. That big rectangular piece of plywood is covering up the hole where the window will go |
| Since the loss of all of our skylights upstairs was making the hallway feel a little dark and closed in, Contractor Larry added a new little skylight above the stairwell |
| It's getting easier to tell which rooms are which now that the framing is further along. This is looking down the hall at the doorway to the master suite |
| Looking from the master bedroom down the hallway to the stairs and the other two bedrooms |