July House Progress Part 2 (July 14 - July 31)

Lots more constructions pictures here, including nearly-complete framing on the first floor and partially done framing on the second floor.
Standing by the front door looking all the way back to the kitchen window


Everything we left in the house (which was a lot) was either packed into boxes and stacked in the basement or covered in heavy tarps.  Thanks to Grandpa Bart and Auntie Colleen for helping out with some of the packing while we were in the hospital
Contractor Larry turned Simon's room into his temporary office while the framing and subflooring went in.  You can see the house plans laid out on a desk made out of the second floor landing rail and a piece of the old kitchen cabinets

Contractor Larry's right hand man Dave puts in new subflooring and reinforces the old

The old landing/bathroom, which will become the upstairs guest bath and (to the left of that new support wall) the master closet

Master closet will be in part of this area

Down in the basement, the beginnings of the sump pump are in place in the new mechanical room which also features the first new permanent drywall we've seen during construction so far

The old breaker box is hanging in the middle of what will eventually become the laundry room in the basement

Someday this will be a basement bathroom, but not as part of this construction project

Standing between the living room in the front of the house and the new dining room looking back towards the kitchen and new family room

The new wall and doorway between the family room and the dining room.  The doorway is much wider than before which will help the dining room feel larger than it is

Future new family room off of the kitchen.  This is where our temp kitchen was located for the first half of the year

The steel beams and solid construction make the house feel so much more secure than it used to.  We're not worried anymore about Simon knocking the house down by accident someday

Standing by the kitchen window looking at the breakfast area.  The new windows have all been put in (including that one you can see above the breakfast table) and we get so much light in the house now

At the kitchen sink looking at the rest of the kitchen.  The fridge will be located on that half wall, with a short counter/cabinet peninsula extending to the right

Leaning out the kitchen window and looking south at the work being done on the new back steps
July 28 suddenly most of the framing was done on the second floor.  This is looking from the master bedroom towards the wall of the master closet, and beyond that to the guest bath

Looking from the master bedroom at the master suite hallway and the master bath

Standing in the master closet looking through the wall and out the back of the house

Standing in the master bath looking through the wall at Grandpa Ken taking a picture of the view from the big master bedroom window

Grandma Cindy makes a few helpful notes on Contractor Larry's house plans, still located in Simon's room

Tough to distinguish with all of the framing but this is an angled view of the doorway to the guest bath on the right

Looking into the guest bath from the doorway on July 31.  That big rectangular piece of plywood is covering up the hole where the window will go

Since the loss of all of our skylights upstairs was making the hallway feel a little dark and closed in, Contractor Larry added a new little skylight above the stairwell

It's getting easier to tell which rooms are which now that the framing is further along.  This is looking down the hall at the doorway to the master suite

Looking from the master bedroom down the hallway to the stairs and the other two bedrooms