| Excavation on March 29, digging out a trench to access the old drain pipe under the basement floor |
Click "Read more" to see lots of pics of the progress in the basement over the past month.
| All the way to a hole under the foundation of the front wall of the house |
| More of the basement dug out a few days later. That door leads out to the new basement area in the back of the house |
| The bottom step is a foot or so above the sand... they later built a temporary landing and walkway which you can see in a later picture. Needless to say, Emily is not allowed down here just in case. |
| The hole under the foundation leading out the the front yard |
| Our basement bathroom is almost done! We're very happy with the design and quality of the fixtures here... not a lot of privacy though. |
| The temporary drain pipe from the last picture was replaced by a new (also temporary) drain pipe on April 13. |
| April 27... much more of the basement is torn up. You can see the start of the real basement bathroom plumbing being roughed in over on the right. |
| The landing and walkway they built to make it easier to get up and downstairs |
| Larry said he's looking forward to when they can pour the cement in the basement... they're getting really tired of playing around in the sand all the time. |
"Needless to say, Emily is not allowed down here just in case."
ReplyDeleteI love this. Emily: carrying precious cargo and far too valuable to risk! Alan: totally expendable.