The foundation for the new back part of the house was built over most of a week, from 2/22/11 to 2/27/11.
| South wall of the foundation frame is in place to hold the cement while it sets |
| Foundation frame west wall. The opening there will be for the doorway leading out to the backyard |
| Foundation frame north wall |
| The new foundation is fully set, frame is gone |
| That's the temporary door to the basement where I took a lot of the other pictures from |
| Walkway on the north side of the house... this was eventually dug out to allow for repair and waterproofing to the existing foundation |
| Another view of the future stairway to the basement |
| South wall of the foundation and part of the stairs/doorway to basement |