It's been a long time coming, but the basement is finally just about finished. When we did the house renovation a few years ago, the foundation was fixed up and some basic framing was put into place down there, but we haven't managed to get the resources together to actually make it into a livable space until recently. We had a little bit of work done on it last summer, putting in a window into the future bedroom space, but then things were on hold again until earlier this year. We had originally thought we would try to do the work ourselves, but eventually realized that it would take forever and take up all of our free time and still might not end up the way we wanted. So we brought Larry back in to start work on it part time while he was finishing up a different job. He started at the end of May and progress was initially slow while the time was split with the other job. Full time work started in September, and by the end of the month drywall was up, the bathroom was mostly assembled, and the cork floors and tile work were all done. October covered trim and painting, and was the end of what we had contracted Larry to do. Finally, at the end of November we had new carpeting installed in the bedroom and tv room, and it was all ready to use.
 |
| Looking south through the bedroom in Jan 2011 and in Nov 2014. |
There are still a few things remaining to do, including putting tops on
the half walls, finishing the wire terminations for the
cable/internet/speakers, and eventually getting some cabinets and
counters for the laundry room and furniture/electronics for the tv room. But it's still all useable for now, and
we're loving having all of this new living space in the house including a
big tv room, bathroom, guest bedroom, laundry room, and little
playroom.
See photos from the past year and a half of work after the jump.
8/20/13
 |
| Bedroom, old window |
 |
| Bedroom, old window, still used for storage |
|
 |
| Bedroom, old window, storage |
8/21/13
 |
| New window for bedroom |
 |
| Bedroom, new window frame |
 |
| Bedroom, new window frame |
8/22/13
 |
| Bedroom, new window |
 |
| Bedroom, new window |
 |
| Bedroom, initial wall frames |
8/23/13
 |
| Bedroom, wall framing |
 |
| Bedroom, wall framing |
 |
| Outside view of new window |
2/17/14
 |
| Laundry room from doorway |
 |
| Laundry Room looking W (towards TV room) |
 |
| Laundry Room looking E (towards bedroom) |
 |
| Laundry Room looking W (towards TV room) |
5/25/14
 |
| Bathroom, looking through wall |
 |
| Well-organized storage under stairs |
 |
| NE corner of basement, at bottom of stairs |
 |
| NW corner of basement |
5/29/14
 |
| NW corner of basement with framing |
 |
| NE corner of basement with framing |
7/23/14
 |
| NW corner of basement with framing, insulation, and tub storage |
 |
| Bedroom with framing and insulation |
 |
| NE corner of basement |
9/1/14
 |
| Speaker and component cables and air vent in TV room |
 |
| Looking E down hallway, standing by bathroom |
 |
| Looking W down hallway from bottom of stairs |
 |
| Bathroom with tub installed |
9/4/14
 |
| Looking W down hallway... fridge temporarily stored under stairs |
 |
| TV room cleaned out and ready for drywall |
 |
| Laundry room cleaned out and ready for drywall |
9/9/14
 |
| SE corner of basement with drywall |
 |
| W down hallway with drywall |
 |
| Bedroom with drywall |
 |
| Laundry room with drywall |
 |
| Looking E down hallway from TV room |
 |
| TV room N wall, partially drywalled |
9/10/14
 |
| Bathroom with drywall |
 |
| Bathroom with drywall and tub framing |
 |
| TV room S wall with drywall |
 |
| TV room S wall with drywall |
 |
| TV Room N wall with drywall |
9/13/14
 |
| TV room N wall with tape and plaster |
 |
| TV Room S wall with tape and plaster |
 |
| Looking E down hallway with tape and plaster |
9/23/14
 |
| Looking W down hallway |
 |
| Bedroom wall primed |
 |
| Laundry room walls primed |
 |
| Laundry room |
 |
| First door in the basement is on the mechanical room |
 |
| TV room N wall primed, some trim in place |
 |
| TV room S wall primed |
 |
| Looking E down hallway |
9/25/14
 |
| Closet in bedroom |
 |
| Heated floor installed in bathroom |
 |
| Some walls around the tub |
9/26/14
 |
| Bathroom floor tiles installed |
9/29/14
 |
| Bathroom floor done |
 |
| Bedroom closet doors installed |
9/30/14
 |
| Cork flooring installed |
10/1/14
 |
| Bathtub tiling started |
 |
| Floor by the stairs, with temporary protective covering |
10/2/14
 |
| Bathtub area almost done |
 |
| Laundry room trim and electrical |
10/6/14
 |
| Sink installed |
10/16/14
 |
| Some painting done |
 |
| Paint in the bedroom |
10/17/14
 |
| Paint in playroom |
 |
| Paint in bedroom |
 |
| Paint in bathroom |
 |
| Paint in laundry room |
 |
| Paint in tv room |
10/26/14
 |
| First time playing in the basement |
 |
| Bowling in the new playroom |
11/15/14
 |
| Driving his new remote control car (a gift from Larry) around the still uncarpeted floor in the tv room |
11/18/14
 |
| Too cold to play outside, so we (carefully) tossed around his new basketball (from the hospital) |
11/25/14
 |
| Newly carpeted tv room |
 |
| More carpet in the tv room |
 |
| Leftover carpet rolled up in the hallway |
 |
| Bedroom carpet |
 |
| More carpet in the bedroom |
 |
| Playroom and bedroom |
11/26/14
 |
| Simon helped me put covers on the open boxes to cover up the cable/speaker wires until they can be finished |
 |
| Wii Baseball in the basement |
 |
| No surprise, he loved it and was great at it |
11/28/14
 |
| Lilly loves having so much room to run around in |
 |
| Soft floors are great for little girls who fall down a lot (like immediately after this picture was taken) |
 |
| Playing in the storage part of the ottoman borrowed from Auntie Colleen |
 |
| She stayed like this for a while and never quite managed to actually climb out |