We had a bit of excitement last night in our normally uneventful life thanks to a large amount of rain and a small amount of roof. Heavy rain was expected yesterday but the roof over the new back of the house isn't complete yet. And in order to build the new roof shape they needed to tear off the back side of the original attic and the ceiling of the upstairs bathroom. Larry told us yesterday morning that if they started on the roof that day it was likely that they wouldn't be able to finish so there was a chance we'd get some water in the house. Figuring we could handle a little dripping here and there, we told him to go ahead with the roof so we could keep things moving. And he was right... we did get some water:
More details and pictures after the fold...
Larry and the boys put in an extra long day yesterday to build out as much of the new roof as possible to cover up the new addition, and really made a ton of progress (I'll put up some pictures of that in a later post). But even with all that, the upstairs bathroom was completely open to the outside. So you'd think that if we got a huge rainstorm, we'd end up with a ton of water in there from the wind blowing it sideways under the partial roof, into the attic, and down into the bathroom. But surprisingly, we got very little up there - once we closed the bathroom door to cut off the cross-breeze from the attic through the hallway and out through the front bedroom, we got almost nothing. The real problem was in the kitchen.
Nearly the entire house has been straightened and supported and leveled with new joists and poles with the exception of underneath the upstairs bathroom since Larry's been holding off on that for now to keep it usable for us. That's not really an issue for us right now, but it does cause a slight dip in the second floor right where the new floor meets the back wall of the bathroom. The subfloor on the second floor addition (the master bedroom) is complete, which is good from a progress viewpoint but bad because it gave the water a place to collect and sit. But since that floor isn't totally level yet due to the dip near the bathroom, all of the water from the entire master bedroom surface funneled down into a single point. It was pretty much the same conditions that can cause flash floods.
The temporary kitchen got completely soaked, but fortunately nothing was damaged that wasn't going to be replaced as part of the construction anyway. Things could have been much worse. Larry's hoping to get most of the rest of the roof and sheeting done today, and he'll put up some plastic sheeting to better redirect the water away from the house for the next time it rains. That's good news for us, since the weathermen are saying we'll be getting heavy thunderstorms for the next 4 days.
| At first we tried to catch all of the water in big Tupperware containers, but we had no chance of keeping up with the water flow using things that small. |
No comments:
Post a Comment